SHFE and SGX are stalled: Mad Dalian too: Vale is pumping iron: Iron ore production reached 91.0 Mt, 4.7 Mt (+5%) higher y/y, driven by improved performance at S11D, Itabira and Brucutu. As previously announced, Vale has revised its production guidance upward to 323-330 Mt (from 310-320 Mt), reflecting continued improvements on operational stability and
The post Vale, BHP pump iron appeared first on MacroBusiness.